Logistics Warehouse Expansion

A logistics warehouse expansion with a cleaned-up MDF, a new floor rack, and 500 feet of armored fiber to a new IDF with Cisco switches and access points.

MDF with two wall-mounted racks of messy multicolor patching, and a new floor rack staged in front.
Before
MDF after the work, with the original wall racks cleaned up and a new floor rack holding switches and dressed black patch cables.
After

Challenge

The warehouse was expanding into additional space. The existing MDF had two original wall-mounted racks, and the patching in those racks was messy. The expansion space needed a network path back to the MDF, plus switching, wireless, and cabling of its own.

Solution

Incite added a new floor rack at the bottom of the MDF and cleaned up the existing racks. A 500-foot armored fiber run was installed from the MDF to a new IDF that serves the expansion space. The new IDF received Cisco switches, and new cabling and Cisco access points were installed in that area.

Result

The MDF is organized: the original racks are cleaned up, and the new floor rack is in place. The expansion space now has a fiber backbone to a new IDF, new switching, new cabling, and wireless coverage from the new access points.

This is facility network work of the kind described on the Manufacturing and Industrial page.